• 14th/15th September 2011 – Panel gessoed then sanded. 610 x 445mm…..
    16th/17th September. The start of the ‘under painting’………it was certainly fun drawing all those chain links…..
    Start of the under painting

    21st September and the first layers of the under painting is complete……..
    Start of the under painting

    27th September and the second layers of underpainting are under way with a small section top right completed……..
    Start of the under painting

    ….detail of top right section…….
    Small section completed